BIM COLLABORATION FOR LIFECYCLE PROJECT

Adopt BIM and obtain benefits from Site Analysis, Existing Conditions, Cost Estimation, Phase Planning (Timeline), Design Review, Design Authoring, 3D Coordination, 3D Control and Planning, Record Model and Asset Management
BIM Benefits:
  • Productive and efficient processes
  • A collaborative, coordinated and communicated environment
  • Risks mitigation for the whole lifecycle project
  • Project handover in less time, less cost and less waste
  • IPD (Integrated Project Delivery) possibility contract
Picture

Management BIM Processes =
Information + Modeling + Processes Management

​

Management BIM Process is also about model, information and processes. Model Management is the generation and delivery of one or more models. Information Management focus on the inclusion of detail of information.  And process management activities focus on facilitating the relationship between project participants by assisting them to select collaboration workflows, delivery standards, and communication protocols as best suited for each particular project, or project phase
​

BIM Benefit:
BIM Coordinator role is a high trained professional in charge to handle Management BIM Processes. Tasks included: Project Digital Home Management, Model Division, Information Exchange, Digital Structure, Hardware specifications, Software licenses; Owner Requirements, BIM Execution Plan creation, Deliveries; International, Local and Office standards; Shared coordinates, Federated Model; Interoperability, Open BIM (IFC and BCF format, MVD’s) and IFC export; BIM Coordination meetings leading
​

Software Tools:
  • Plannerly
  • Naviswork/ Solibri
  • BIM Collab/ BIM Track
Picture

dESIGN

In a project each task needs to be carry out in a particular order for the mutual benefits. In a collaborative working environment, teams are asked to produce information using standardized processes to ensure quality. This approach does not require more work, as this information has always been required to be produced.

BIM Benefit:
  • Enabling information to be used and reused without change of interpretation in every phase of the project. ​
​
Method tools:
  • ISO 19650
  • Project Execution Planning Guide V 2.0. Penn State University
  • PROJECT BIM EXECUTION PLAN (The New Zealand BIM Handbook 2019 Edition)
  • PAS 1192-2:2013
  • Plannerly cloud-based tool
​

Picture

+mODELING + DESIGN + AUTOMATION

Modeling and good practices are the first step, but still there is a lot road ahead. Use BIM modeling tools for design in Architectural (Phases, Options Design), Mechanical, Electrical, Plumbing, and Structural disciplines. Adopt automation routines for repetitive routines
​

Benefits:
Modeling and Design with BIM software in a Common Data Environment (CDE) give you the opportunity to collaborate between modelers and designer (architects, engineers). This improve communication and collaboration, save time, and deliver a more currency delivery
​

Software Tools:
  • Autocad
  • Revit
  • Dynamo
  • PyRevit
  • Generative Design 
Picture

3D COORDINATION = QUALITY + CLASH DETECTION

Quality are the processes and systems which aim to fulfil the customer's requirements, enhance customer satisfaction, monitor against applicable quality standards and achieve continuous improvement. Clash detection is the use of 3D Models to coordinate different disciplines (e.g. structural, mechanical,) and to identify and resolve possible clashes between virtual elements prior to actual construction or fabrication
​
Benefits:
3D Coordination BIM Use eliminate the mayor system conflicts risk prior installation. This reduce coordination meeting in situ time, reduce unnecessary rework, and avoid crew time wasting. 


​
Software Tools:
  • Naviswork/ Solibri
  • BIM Collab/ BIM Track​
Picture

project bim manager = phase planning + cost estimation

Phase planning (4D = 3D + dimension time) is utilized to show the sequence and space requirements on building site. 4D modeling is a powerful visualization and communication tool that give a better understanding of project milestones and construction plans
 
Cost Estimation (5D = 4D + dimension cost) is a process in which a BIM model is used to generate an accurate quantity take-off cost estimate early in de design process. This process also allows designers to se the cost effect of their changes in a timely manner can help curb excessive budget due to projects modifications

Benefits:
  • Cost Estimation: BIM allow you include Estimator in early stage of the project. Model-based Cost Estimation automates quantifying and applying cost tasks, saving time and allowing technician to focus on higher values factors, such as better offers analysis. This reduce human-error risk, and save money
 
  • Phase Planning: On pre-construction phase Model-based Phase Planning allow identify construction assemblies and factoring risks. On construction phase allows for documentation to be easily changed to adapt to new information such as site conditions. Schedules can be planned more accurately and communicated exactly, and the improved coordination helps projects be more likely to be completed on-time or early. This eliminate construction schedule setback
​
Software Tools:
  • Common Data Environment Design-Contractor-Sub Contractors
  • Open BIM (IFC format, BCF format)
  • Interoperability Naviswork + MS Project Manager
  • Interoperability Naviswork + Excel (Power Query)
Picture

construction = project bim manager + pre-fabritation

Project BIM Manager is the correct use of Navisworks + MS Project (Phase Planning) and Excel Query (Cost Estimation) for Project Management. Prior phase BIM methodology produce a high quality and accuracy documentation, that can be used to instantly generate production drawings or databases for manufacturing purposes, allowing for increased use of prefabrication and modular construction technology

Benefits:
By designing, detailing and building offsite in a controlled environment, you can diminish waste, increase efficiency, and reduce labor and material costs

​
Delivery tools:
  • Deliveries: 2D documentation, 3D IFC model
  • Open BIM for better communication, collaboration and coordination between stakeholders, supply and financial department
Picture

project finances

Construction or Infrastructure project is not only for architecture and engineering. Also contain Estimators, Schedulers, Suppliers, Financial and Accounting department

Benefits:
  • Better communication and collaboration
  • Better information for decision takes
​​
Communication-Collaboration tool:
  • Common Data Environment between Financial Department-Supply Department-Project Manager 
Picture

handover + operation

Put a smile on your Facility Manager’s client. Active management is the BIG and final beneficed. Handover the building or infrastructure project, but also deliver RVT model format, IFC model format, and standards COBie for CMMS (Computerized Maintenance Management System) in a pen driver


Delivery tools:
  • Asset Management information CMMS (Computerized Maintenance Management System) in on document: Standards COBie (Construction-Operation Building Information Exchange)
​​
Picture

rEADY TO GET STARTED?

Submit
Powered by Create your own unique website with customizable templates.
  • BIM Collaboration
  • BIM
  • BIM Specialist
  • Certifications
  • Portfolio (Arch)
  • Porfolio (Structural)
  • Porfolio (Piping)
  • BIM Services and Contact